
Solutions
Live in days, with your operation still running
Most rollouts fail on logistics, not technology. We handle the install, the enrollment and the cutover so day one looks like a normal shift.
Rollout planningDevices pre-enrolledCrew onboarding
What we do
- Site survey and coverage assessment before anything is ordered
- RoIP gateway installation and repeater integration
- Device enrollment, hardening and hardware-key configuration
- Talkgroup, role and escalation-chain design mapped to your org
- Checkpoint placement: NFC tag and QR siting across patrol routes
- Phased cutover from legacy radio with a rollback plan at each step
Typical timeline
- Week 0: survey, talkgroup design, hardware order
- Week 1: gateway install, device provisioning, crew live
- Week 2: full rollout, dispatcher training, legacy fleet bridged
- Week 4: adoption review and configuration tuning
Put Pushytap to work with your team
Explore voice, dispatch and safety with your team, or talk to sales about a larger deployment.