Live in days, with your operation still running
Most rollouts fail on logistics, not technology. We handle the install, the enrollment and the cutover so day one looks like a normal shift.
What we do
- Site survey and coverage assessment before anything is ordered
- RoIP gateway installation and repeater integration
- Device enrollment, hardening and hardware-key configuration
- Talkgroup, role and escalation-chain design mapped to your org
- Checkpoint placement — NFC tag and QR siting across patrol routes
- Phased cutover from legacy radio with a rollback plan at each step
Typical timeline
- Week 0 — survey, talkgroup design, hardware order
- Week 1 — gateway install, device provisioning, pilot crew live
- Week 2 — full rollout, dispatcher training, legacy fleet bridged
- Week 4 — adoption review and configuration tuning